Installation; Boiler Fixing; Fuel Supply - Riello Burners Gulliver RGS Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 12
3.

INSTALLATION

THE BURNER MUST BE INSTALLED IN CONFORMITY WITH LEGISLATION AND LOCAL STANDARDS.

3.1 BOILER FIXING

Put on the flange (1) the screw and two nuts, (see fig. 3).
Widen, if necessary, the insulating gasket holes (4), (see fig. 4).
Fix the flange (1) to the boiler door (3) using screws (5) and (if necessary) the nuts (2) interposing the
insulating gasket (4), (see fig. 2).
After installation ensure that burner is lightly inclined as in fig. 5.
Fig. 2
Fig. 3

3.2 FUEL SUPPLY

The burner is designed to allow entry of the oil supply pipes on either side.
Depending on the oil supply pipes position (to the right or to the left hand side of the burner) the fixing plate
(1) and closing plate (2) should be reversed, (see fig. 6).
1
2623
Fig. 6
2
D4017
3
GB
D5012
Fig. 4
S7071
D5025
Fig. 5
1

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

3739950

Table des Matières