Post-Installation Checklist - Panasonic KY-T935XL Mode D'emploi

Masquer les pouces Voir aussi pour KY-T935XL:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Post-installation Checklist

Upon completing installation, check and mark off the following items.
Checklist
Appearance ■ Ensure that the appliance is not tilted.
■ Is the top plate clean?
Electrical
■ Is the power supply a single-phase (220-240 V ~), or a
work
three-phase (380-415 V 3N~)?
■ Has the earth been installed?
■ Has the earth leakage circuit breaker been installed?
Electrical
1. Touch
testing
■ Does the main power light illuminate?
2. Touch the following areas to check function of
each cooking zone:
■ Left front
■ Left middle
■ Left rear
■ Middle front
■ Middle rear
■ Right front
■ Right middle
■ Right rear
■ Make sure to turn off each cooking zone and the main power switch after
performing electrical testing.
■ Hand the Operating / Installation Instructions to the customer.
to turn on the main power.
I hereby certify that installation has been completed.
Checked
Does
fl ash?
Signature of installer
49
EN-

Publicité

Table des Matières
loading

Table des Matières