Télécharger Imprimer la page

Riello RG5D Instructions Pour L'installation, L'utilisation Et L'entretien page 43

Masquer les pouces Voir aussi pour RG5D:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

3.4 ELECTRICAL WIRING
ATTENTION:
Do not swap neutral and phase over, follow the diagram shown carefully and carry out a good earth con-
nection.
The section of the conductors must be at least 1mm². (Unless requested otherwise by local standards and legislation).
The electrical wiring carried out by the installer must be in compliance with the rules in force in the country.
~
50Hz 230V
N
L
Safety thermostat
T
7 pin plug
L1
N
7 pole socket
Ignition
CONTROL BOX
electrodes
552SE
D5336
A
S7120
2194
● Connect 2nd stage thermostat between clamps T6 - T8
Main switch
T6A
Limit thermostat
T
T1
T2
S3
B4
Brown
Blue
Brown
Blue
Black
White
Blue
Burner-earth
Fig. 11
CONTROL BOX
To remove the control-box from the burner, loosen screw (A, fig. 11) and pull
to the arrow direction, after removing all components, the 7 pin plug and
earth wire.
In case of disassembly of the control box, retighten the screw (A) with a
torque wrench setting of 1 – 1.2 Nm.
by removing the bridge.
TESTING: Check the shut-down of the burner by opening
the thermostats and the lock-out by darkening
the photoresistance.
st
1
stage
h
hour counter
(230V - 0.1A max.)
Remote lock-out signal
(230V - 0.5A max.)
Photoresistance
nd
2
stage oil valve
5
GB
nd
2
stage hour counter
h
(230V - 0.1A max.)
nd
2
stage
T
thermostat
4 pin plug
B5
T6
T7
T8
4 pole socket
st
1
stage oil valve
2 1
3 2 1
ELECTRONIC
DELAYING DEVICE
M
~
M

Publicité

loading

Ce manuel est également adapté pour:

Rg5d tl398t1373980520052626