WIKA PG43SA-D Mode D'emploi page 13

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

5. Commissioning, operation
For installation, in accordance with the fitting and flange standards
the appropriate fastenings, such as screws and nuts, must be
used.
The vent hole at the underside of the case must not be closed.
Nominal position per EN 837-3 / 9.6.6 figure 7: 90° (
5.3 Mounting instructions for instruments with EHEDG and 3-A
Observe the following instructions, especially for EHEDG certified
and 3-A conform instruments.
To maintain the EHEDG certification, one of the EHEDG-recom-
mended process connections must be used. These are marked
with the logo in the data sheet.
To maintain the conformity to the 3-A standard, a 3-A conform
process connection must be used. These are marked with the
logo in the data sheet.
Mount the instrument with minimal dead space and able to be
cleaned easily.
The mounting position of the instrument, welding socket and
instrumentation T-piece should be designed to be self-draining.
The mounting position must not form a draining point or cause a
basin to be formed.
With the process connection via an instrumentation T-piece, the
branch L of the T-piece must not be longer than the diameter D of
the T-piece (L ≤ D).
Special instructions for in-line versions
In-line access units (e.g. NEUMO BioControl
tion T-pieces in horizontal pipes should be installed with a slight
pipe inclination for self-draining.
WIKA operating instructions disphragm pressure gauge, model PG43SA-D
)
) and instrumenta-
®
EN
13

Publicité

Table des Matières
loading

Table des Matières