Preparing The Setup Location And The Connections - Steinbach Waterpower 5000 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 73

Preparing the setup location and the connections

Careful selection and good preparation of the setup location significantly simplifies
installation and operation of the heat pump. The following requirements must be met or
considered:
- Outdoor location
- Protection from flooding and severe exposure to rain or sprinkler systems
- Stable, level ground not subject to the influence of water
- Required minimum distance to walls or objects (see Fig. D)
- Required minimum distance of 2 m to the pool.
- Easy connection of the water lines
- Easy connection of the power supply
- Easy access to the display
- Ability to drain condensation water
- Surroundings not sensitive to vibration and noise
For a still more efficient use of the heat pump, we recommend to add our
Steinbach bypass set (item no. 060045).
Preparing the setup location
D
700 mm
2100 mm
700 mm
51

Publicité

Table des Matières
loading

Table des Matières