Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

For the Poolsquad ®PRO Model, in addition (ORP probe)
1 ORP probe
1 analysis
chamber
ofanalysis

3/ INSTALLATION

Before proceeding with installation of the device, it is imperative to check the following points :
✓ Ensure that any hydraulic equipment is in good working order and is correctly sized. In particular, check
the flow of the filtration pump, the capacity of the filter and the diameter of the waterworks.
✓ The maximum pressure of the water in the cell must not exceed 3 bars.
✓ The device's treatment capacity should be adapted to the volume of water to be treated and in the
climate of the place of installation. In case of warm climate or in case of using drilling water, a device
designed to treat a volume of 100 m
3
80m
.
Be careful with natural water sources (drilling waters) !
Preferably use water from the public water supply. Avoid using any water from natural sources (rain, run
off water, reservoirs, and wells) under risk of early deterioration of chlorination cell.
✓ The installation area should be dry and properly ventilated (maximal ambient temperature of use : 35°C),
protected from rain, splashes, water spray, and UV radiation. Ensure that the pH corrector product
container is kept in a place sufficiently remote from any electrical equipment and any other chemical
product.
Failure to comply with this instruction will lead to abnormal oxidation of the metallic parts which could
result in complete breakdown of the device. Guarantee doesn't be used in this case.
✓ The assembly of the devices (according to the model) must be performed strictly in compliance with the
following layout diagram.
It is strongly recommended that device has to be installed, put into service and maintained by
AUTOSALT®/POOLSQUAD®/POOLSQUAD® AMPERO/PRO - PAPI004082 – FR/EN/ES/DE - Rev.03.16
1 standard
2 saddle
solution
Diam. 50 mm
470 mV
Ø ½ "
3
in moderate climate must be limited to a family swimming pool of
skilled and specialized professional
2 isolating
5 m semi
valve
flexible tubing
2 injections
connector
4

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

PoolsquadPoolsquad amperoPoolsquad pro

Table des Matières