Kemper CleanAirTower Notice D'utilisation page 66

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 86
Pos.
Designation
1
Maintenance cover
2
Dust chute
3
Hose NW 60
10. Remove the maintenance cover (Pos. 1). Ensure that the attached earth lead is not
damaged.
11. Connect the dust chute (Pos. 2) with the filler neck (Pos. 4). To do this, use the hose
(Pos. 3) and fix it in place with the hose clamps.
1502828-01
Fig. 30: Connecting the dust chute with the filler neck
Tab. 17: Positions on the product
- 66 -
Pos.
Designation
4
Dust collection container filler neck
5
Dust collection container
EN

Publicité

Table des Matières
loading

Table des Matières