Riello Gulliver RG4D Manuel D'entretien page 35

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

3.
INSTALLATION
THE BURNER MUST BE INSTALLED IN CONFORMITY WITH LEGISLATION AND LOCAL STANDARDS.
3.1 BOILER FIXING
Put on the flange (1) the screw and two nuts, (see fig. 3).
Widen, if necessary, the insulating gasket holes (4), (see fig. 4).
Fix the flange (1) to the boiler door (3) using screws (5) and (if necessary) the nuts (2) interposing the
insulating gasket (4), (see fig. 2).
After installation ensure that burner is lightly inclined as in fig. 5.
Fig. 2
Fig. 3
3.2 FUEL SUPPLY
The burner is designed to allow entry of the oil supply pipes on either side.
Depending on the oil supply pipes position (to the right or to the left hand side of the burner) the fixing plate
(1) and cable clamp (2) should be reversed, (see fig. 6).
1
1893
Fig. 6
2
2
3
GB
D5012
Fig. 4
S7071
D5025
Fig. 5
1
D5345

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

397 t13739710

Table des Matières