MEGA PREX SL BOILER CASINGS
- Wrap the rock wool around the boiler body leaving the bulb well on the right side exposed.
- Fit the lower panel (1S), inserting the fold into the square tube and repeat the same procedure with the upper panel (2S).
- Fit the upper panel (3S) on the boiler; fit the control panel on the panel (3S); uncoil the thermometer and thermostat
capillaries and insert the bulbs in the wells.
- Fit the panels (1D) (2D) and (3D) ensuring that the capillaries are inserted in the slot provided in the panel (3D); securing
the control panel to panel (3D).
- Fit the panels (4S) and (4D), connecting them to the side panels by means of the brackets; fit the front panel (5) con-
necting it to panels (4S) and (4D). Close the manhole casing by fitting the upper panel (6).
- Fit the back panel (7), connecting it to the side panels by means of the brackets.
Key
P
Bulb wells
TR
Regulation thermostat
TS
Safety thermostat
TM
Min. thermostat
TMC Boiler
- 45
-
ASSEMBLY