Masquer les pouces Voir aussi pour Powerware Série:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

EBM Installation

Eaton
A small amount of arcing may occur when connecting an EBM to the UPS. This is normal and
will not harm personnel. Insert the EBM cable into the UPS battery connector quickly and
firmly.
To install the optional EBM(s):
1.
Verify that all circuit breakers are in the OFF (O) position (see
Figure 25).
2.
Remove the cable retention clip from the UPS battery connector.
Retain the clip and two screws.
3.
Remove the cable retention clip from all EBM battery connectors
except on the EBM installed in the lowest position in the rack.
Retain the clips and screws.
4.
Plug the EBM cable(s) into the battery connector(s) as shown in
Figure 25. Up to four EBMs may be connected to the UPS.
5.
Turn each cable retention clip 90 degrees and reinstall each clip to
hold the EBM cable firmly in place.
6.
Continue to the following section, "UPS Installation."
NOTE After UPS installation, ensure maximum battery runtime by configuring the UPS for
the correct number of EBMs (see page 52).
®
9140 (9910-E82/E83) UPS Installation Guide for IBM
C A U T I O N
S
®
Applications
164201715 Rev 2
www.eaton.com/ibm
INSTALLATION
27

Publicité

Table des Matières
loading

Table des Matières