Eaton Powerware Série Guide D'installation page 24

Masquer les pouces Voir aussi pour Powerware Série:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

INSTALLATION
8
®
Eaton
9140 (9910-E82/E83) UPS Installation Guide for IBM
www.eaton.com/ibm
3.
Using two M5 machine screws and an adapter plate, attach the rail
to the front of the rack (see Figure 1 and Figure 2).
Do not tighten the screws.
4.
Adjust the rail size on the rail assembly for the depth of your rack
(see Figure 3).
Rear
Figure 3. Adjusting the Rail Depth (Right Rail Assembly Shown)
Front M5 Screws
Figure 2. Securing the Front Rail
S
®
Applications
164201715 Rev 2
Position 6
Position 5
Position 4
Position 1
Adapter Plate
Front

Publicité

Table des Matières
loading

Table des Matières