INSTALLATION
18
®
Eaton
9140 (9910-E82/E83) UPS Installation Guide for IBM
www.eaton.com/ibm
2.
If access to the sides of your rack is difficult, adjust the length of
the rails (see Figure 15) and loosely install the fasteners (see
Figure 17) before continuing to Step 3.
3.
Using two M5 machine screws and an adapter plate, attach the rail
to the front of the rack (see Figure 13 and Figure 14).
Do not tighten the screws.
Figure 14. Securing the Front Rail
S
®
Applications
164201715 Rev 2
Front M5 Screws
Position 6
Position 5
Position 4
Position 1
Adapter Plate