IMPORTANT: The flanges of duct 5 go under duct 4. The front
edge of the duct should be flush with the microwave oven itself
and not the door.
Correct
Install Rails and Bottom Duct
1. Make sure notch is at bottom of rail. Position the rail marked
L on the left side of the cabinet with the bottom edge resting
on the cabinet floor. Verify rail is flush with the face of the
cabinet before proceeding. Drill pilot holes. Attach mounting
rail using 4 #8-14 x Z\x" screws.
NOTE: Drive screws in the center of the holes in the
mounting rail.
Notches
Left Rail
Mounting rail
2. Repeat Step 1 on right side of cabinet. Use the following
chart and illustration to measure the distance between center
of mounting rail holes. Use shims if measured distance is
incorrect.
27" (68.6 CM)
INSTALLATION
25Z\x" (64.8 cm)
Incorrect
Right Rail
30" (76.2 CM)
INSTALLATION
28Z\x" (72.4 cm)
3. Position bottom duct in cabinet so that each side of duct is
the same distance from the side walls and spacers are flush
with cabinet.
A A
Dimension A must equal Dimension B.
Spacers behind holes
4. Drill pilot holes for 2 holes on the front of the bottom duct.
A. Pilot holes
5. Secure bottom duct to cabinet floor with 2 #8-14 x Z\x"
screws on front of bottom duct.
B
B
A
7