Installation Of Products; Control Box - Bodet Harmonys 907760 Notice D'utilisation Et D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

II - Installation of products
Select the location where the control box will be installed by making sure of the presence of the
network cable PoE (Plan the routing of the cable in the back or by the bottom of the product).
Warning: when feeding the cables through the bottom, we recommend the use of a wire molding
(25x30mm min.) to cover the hole at the bottom of the casing.

2.1 Control box

1/ Drill 4 holes for wall mounting according to the following pattern.
(The drilling dimensions are printed on the back of the housing).
34
2/ Open the flaps at each end of the product.
3/ Mount the box to the wall (B), taking care to get the Ethernet cable into the housing (cable from
the back or bottom of the housing control box).
4/ Open the casing by removing the 4 screws (A). The front cover is held by straps allowing it to
hang down when opened.
Control box - front view
Control box or control box extension - back view
139
(A) Screws to open the case (x4)
(B) Wall mounting screws (x4)
17

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Harmonys 907761

Table des Matières