Establishing The Connection With The Extractor Hood - Berbel BFB 6bT Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Operation
3.2.1
Establishing the connection
with the extractor hood
 When working on the extractor
hood refer to the corresponding
instructions.
Perform the following steps in parallel on
the remote control and on the extractor
hood.
Remote control
☞ Press and hold both buttons at the
same time (> 3 seconds) to start
the connection process.
Both buttons flash for 2 minutes.
☞ Perform the following steps for the
control panel supplied with your
extractor hood.
122
Ceiling lift hoods
☞ Press and hold the two additional
buttons at the same time (> 3 seconds).
6005229_0 – 08.09.2020

Publicité

Table des Matières
loading

Table des Matières