GENERAL PRECAUTIONS
•
•
•
•
1. DHW circuit
1.1
1.2
1.3
2. Heating circuit
2.1 New system:
2.2 Existing system:
•
•
•
Failure to observe the above will render the warranty null and void. The names of the Authorised Service Centres are
indicated in the attached sheet. Prior to commissioning, remove the protective plastic coating from the boiler. Do not use
any tools or abrasive detergents to do this as you may damage the painted surfaces.
ENERGY-SAVING TIPS
Adjustment in the heating mode
Domestic hot water
7221796.02 (1-10/15)
4