Rechner Sensors LEVEL KFS-4 Série Manuel D'utilisation page 17

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Depositions on the probe are negligible for the measurement as long as there is no bridge building to the
container wall or other metal. The holding device has to be fixed at the inactive area of the probe with main-
tenance of the minimum distance (see fig. 2 and 3).
Fig. 2 KFS-5-.../KFX-5-... probe with fixed limit value switching points
Fig. 3 KFS-4-.../KFX-4-... probe with variable limit value switching points
The evaluation units are available in following versions:
• KFA-5-1-... / KFA-4-1-...
• KFA-5-2-... / KFA-4-2-...
• KFA-5-3-M(S)-... / KFA-4-3-M(S)-... A three-point evaluation unit (extension possible using the Master/
• KFA-5-4-...
• Furthermore there is a compact probe KFX-5(4)-... with integrated evaluation unit in the connection
head.
The connection of the supply voltage has to be made according to the diagram on the unit. Observe the
correct assignment of the power supply!
Attention:
The potential BE has to be connected to the container potential! This connection should be made over
the shortest distance and routed with straight wire. (Shortening or lengthening of the cable is possible,
using a single-lead cable 0,25...1,5 mm
Measuring systems with wire break control (FB) indicate three operating states:
• Sensor connector off:
• Measurement all right:
Please note:
Wiring should be routed separately or screened from large value conducting cables, as in extreme cases
inductive peak voltages can destroy the sensors despite the integrated protective circuit.
Please take note that the use of a DC/DC-transducer calls briefly for a higher current than the operating current
when initially switching on the equipment. Therefore the power supply must have enough low-impedance!
The coaxial connectors of the sensors have to be connected to the amplifier. With probes with 2 or more
switching points the colour marking has to be observed to achieve the following assignment of
the measuring points: measuring point 1 = below, measuring point 2 = middle etc.
With operation requiring more than one evaluation unit KFA-5-3-M..., KFA-5-4-... (Master) with
1 (or more) KFA-5-3-S-... (Slave) the units must be linked to each other with the connection
cable which is supplied with the slave.
xa
Vxb = Beginning of the variable range (2nd m. point)
xc
An one-point evaluation unit (see dimension No. 1 + 2, page 18)
A two-point evaluation unit (see dimension, page 19)
Slave-Principle) (see dimension 5, page 26)
with 4 switching points (extension possible using the Master/Slave-
Principle) (see dimension, page 22)
2
one- or multi-wire).
-
wire break is determined,
the output is activated, the LED flashes green
-
filling level „empty",
the output is not activated and the LED is static red
-
filling level „full"
the output is activated, the LED is static green.
= End of the variable range (1st measuring point)
= End of the variable range (2nd measuring point)
17

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Level kfs-5 série

Table des Matières