INSTRUCTIONS FOR AUTHORISED PERSONS
4
INSTALLATION
The unit may only be set-up by authorised persons.
4.1

Before installation

The safety instructions must be read carefully before installation. You must definitely fulfil the requirements stated by the uwe company and by the
standard authorities. If the instructions are not observed, the installation engineer shall bear the sole responsibility. The manufacturer shall thus be
absolved of any liability.
4.2
Installation in In-Ground Pools (Fig. 1)
Remove the retention pins (1) by turning anticlockwise. These are not required for in-ground pools. Place the unit at the edge of the pool in the position you
require.
The unit must be horizontal, support if necessary.
Positioning the Nozzle
Adjust the height of the nozzle (2) to the water level. To do this, unscrew the hexagon nuts (3) and move the nozzle either up or down to the correct height.
The nozzle must be 20 cm below the water level. The distance from the edge of the pool down to the water level
must not exceed 27 cm.
Further Installation
Secure the unit together with the rubber buffer (4) to the pool wall.
The gap between the pool wall and the back of the housing submerged in the water must be at least 20 mm.
Extensions are available.
Mark the 4 mounting holes on the outer edge of the base plate (6) which are now accessible. Fix the unit in place with the M 8 x 60 screws.
The base plate must be level and must not be bent out of shape. Support if necessary.
Unscrew the screw plug (8). Slowly fill the pump with water.
When the pump is full (volume approx. 8.5 l) water does not overflow but flows back into the swimming pool through the nozzle.
Screw in the screw plug and washer and screw tight. Fit the cover (5) (supplied separately). On the inside of the cover there is a holding band (15). Pull the
free end of the holding band through, under the pressure plate (14) which is on the base plate. Screw in both Phillips screws of the pressure plate. The
cover must be fixed securely to the base plate via the band. Secure the cover (5) using the 4 fastening screws (13).
The unit has a safety switch and can only be started once the cover (5) has been fitted. If the pump fails to pump water after the
first attempt to start it, you must re-fill the pump with water (there is still air in the pump housing). You must continue to fill the
pump until the nozzle reaches its full power.
rubber buffer 55, min. 25, max. 80
Width of equipment 350 mm
1 (400 V)
Measurements in mm
13
rubber buffer 55, min. 25, max. 80
Width of equipment 350 mm