1.4 - Commissioning

This paragraph describes the Equipment's commissioning at general way. For more details,
see the chapter 5 "Startup Guide".
NOTE:
The equipment can be operated from a PC fitted with VT100 emulation and HTTP navigator;
its minimum configuration is defined in section 1.4.1.
A local terminal with VT100 emulation is indispensable during the first commissioning, in
order to be able to access the equipment via the management function; however, this
terminal only enables the communication function to be parameterized.
Procedure.
#
On the first commissioning, the equipment scans its constitution and considers it as the
expected configuration, in service, monitored. It is thus advisable to insert the traffic cards
before power-up, in order to speed up the commissioning.
#
Switch on the power supply connected to the equipment.
#
The equipment conducts self-tests:
!
When self-tests have run correctly, the "ON" indicator is lit,
!
In the opposite case, an indicator flashing code defines the faulty self-test (contact the
hotline).
#
Parameterize the communication interface, using the VT100 (see § 1.4.1).
#
Using the HTTP navigator, (see § 1.4.3).
!
Update the equipment time and date
#
Connect the 2 Mbit/s, 34/45 Mbit/s, Ethernet, STM1 or SYNC ports, according to the
required equipment composition,
#
Connect the AUX and EOW ports required.
#
Download a predefined configuration or prepare the desired configuration, using the HTTP
navigator:
!
Create the connections
!
Establish the wished protection (MSP protection, SNC protection ...)
!
Choose the synchronization source, and change its parameters if required.
!
Change, if necessary, the configuration parameters and the alarm configuration.
The default configuration of the various parameters is provided by § 2.3
#
Conduct the tests on STM-1 links, complying with the process described in Figure 1-10.
#
From that moment, the equipment is operational.
#
Operating alarms can signal a wrong connection of interfaces. Check the connection of
ports, the alarms corresponding to the connected ports, and correct any problems that may
arise.
#
Save configuration.
REMARK:
It is possible, once the commissioning is performed, to connect additional 2 Mbit/s G.703,
E3/DS3, Ethernet or STM1 ports, and to insert or extract powered cards.
No reproduction or communication without the written consent of SAGEM SA
1 - INSTALLATION AND COMMISSIONING
Installation and User Guide - N56717020104
Page A1-23