Brita PROGUARD Coffee Mode D'emploi page 53

Masquer les pouces Voir aussi pour PROGUARD Coffee:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 85
5.2 Installation and Putting The System Into Operation
Step
Preparation and positioning
#1
• Make sure all installation requirements are met (see chapter 4: Installation Requirements)
• Use the App to determine the suitable type and size of the pre-filter
• Use the App to determine the recommended bypass setting of the pre-filter head
• In case the App indicates the need of an electric booster pump, further information about
it can be found in chapter 5.3: Specification and Installation of an Electric Booster Pump.
1.1
Make sure to have sufficient space available for PROGUARD Coffee and its pre- and
post-filter at the intended place of operation
1.2
EN
53

Publicité

Table des Matières
loading

Table des Matières