Fortress Building Products V Série Instructions D'installation page 6

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Fig. 1
Disposable
Upright
POST MOUNTING
*If using Fortress Evolution Framing, contact Fortress for instructions.
Note:
It's recommended to install brackets on to post before Post
Mounting. Reference page 8 for Bracket Installation steps.
Step 1:
Install Wood Blocks
1. Install Wood Block level with top of joist. As shown in
Fig. 1 below.
2. Secure Wood Block to blocking on all four sides with
#10 X 3-1/2" [89mm] deck screws.
• Wood Block must be constructed with treated dimensional
lumber with a minimum thickness of 1-1/2" [38mm].
Joist
Fig. 1
Blocking
(A)
6
V-SERIES: VERTICAL CABLE INSTALLATION
Disposable
Upright
(A)
#10 x 3-1/2"
[89mm]

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

V-series

Table des Matières