Fortress Building Products V Série Instructions D'installation page 16

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

WOOD TOP RAIL CAP INSTALLATION
Step 1:
Install Wood Top Rail Cap
1. Measure the distance from the inside edge of the 2 posts.
2. Cut the Wood Top Rail Cap to measured length.
3. Test fit & Install Wood Top Cap. Re-cut wood, if required.
Fig. 1
Step 2:
Install Cap Rail Clips
1. Cap Rail Clips should be equally spaced along the length of
Wood Top Cap (Max Spacing is 28" [711mm]).
As shown in Fig. 1 below.
2. Secure Cap Rail Clips to Wood Top Rail with
provided screws. As shown in Fig. 2 below.
Fig. 1
BRACKET CAP, POST BASE COVER & PRESSED DOME/BALL CAP
Step 1:
Install Bracket Cap, Post Base Cover & Pressed Dome Cap
1. Bracket Caps snap down over Bracket Cups.
As shown in Fig. 1 & 2.
16
28" [711mm]
Max Spacing
INSTALLATION
V-SERIES: VERTICAL CABLE INSTALLATION
Fig. 2

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

V-series

Table des Matières