Fortress Building Products V Série Instructions D'installation page 32

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3. Attach the panel to brackets using the T-25 Screw that
came with the brackets. Two screws are required in all for
brackets. As shown in Fig. 1 below.
4. Remove any metal shavings after attaching the panel.
Note:
• Screws should be installed on the same side of brackets.
Fig. 1
Step 3:
Tensioning Cable
• Reference pages 35 & 36 for Cable Tensioning steps.
STAIR BRACKET: FLAT ATR INSTALLATION
Step 1:
Install Flat Accent Top Rail (ATR)
1. Measure the distance between posts.
2. A minimum of two ATR Spacers are required in order to
ensure proper fit of ATR.
3. Transfer that measurement to the ATR and cut a equal
distance from each end of ATR.
4. Use an Adjustable Angel Finder to measure needed angle
to make the ATR flush with the post. As shown in Fig. 1.
5. Test fit the ATR. Re-cut ATR if required.
6. File any rough edges from cuts and apply zinc based touch
up paint.
7. Apply a quarter sized drop of epoxy to the side walls of
each ATR Spacer. Follow cure times specified on epoxy
packaging. As shown in Fig. 2.
8. Install ATR onto rail and wipe away any excess epoxy with a
clean cloth. As shown in Fig. 3.
32
Thread
Cutting
Screw
V-SERIES: VERTICAL CABLE INSTALLATION

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

V-series

Table des Matières