Electrical Connection - Speck pumpen INOVA NH 20/40 Notice De Montage Et De Mise En Service

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

• If necessary, lever up and remove the thermal insulation shell
with a screwdriver
• Loosen the internal hexagon screws
• Turn the motor housing, including control module.
NOTE: Generally turn the motor head before the installation is
filled. When turning the motor head in an installation which is
already filled, do not pull the motor head out of the pump hous-
ing. Turn the motor head with a small amount of pressure on the
motor unit so that no water can come out of the pump.
CAUTION! Risk of damage to property!
The gasket may be damaged when the motor housing is
turned. Replace defective gaskets immediately.
• Screw the internal hexagon screws back in and tighten them.
• If necessary, fit the thermal insulation shell which can be
ordered separately.
7.2

Electrical connection

CAUTION! Danger of death!
A fatal shock may occur if the electrical connection is not
made correctly.
• Only allow the electrical connection to be made by an electri-
cian approved by the local electricity supplier and in accord-
ance with the local regulations in force.
• Disconnect the power supply before any work.
• If the module cover is inadmissibly opened and the front film
removed, there is a danger of electric shock by touching the
electrical components located inside and the contacts
underneath the front film.
• The current type and voltage must correspond to the details on
the name plate.
• Connect the electrical connector (Fig. 4).
Installation and operating instructions INOVA NH
English
27

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Inova nh 25/40Inova nh 25/60Inova nh 32/40Inova nh 32/60

Table des Matières