4.3
ELECTRONIC CONNECTION OF THE CAPACITIVE SENSORS
Capacitive
Hopper
Minimum
Capacitive
Silo
Capacitive
Hopper
Máximum
4.4.
FILLER NECK
First of all we will break the die-cut part installed in the rear chamber of the hopper in order to access the rear of the hopper where we will find
a metallic plate screwed to it. We will unscrew this plate and place/screw the filler neck depending on our boiler. Then we will join the hole of
the tank with the hopper through the flexible pipe provided for this.
OPERATING INSTRUCTIONS
CN5
ROJO
CN19
CN6
AUX 2
L 3
V2
PO
N
CN13
CN4
AL1
AL2
RESISTENCIAS
INFIN
TANGENCIAL
HUMOS
N
F
CN8
Gearedmotor
16
Ground
1000 L AUXILIARY TANK