WET PACKED SNOW
Move slowly into snow of this condition. The
greater the depth, the slower you should go.
When it appears that the wet, packed snow
is causing the auger to slow down and the
chute to clog, back off and begin a series of
short jabs into the snow. These short back
and forth, 4 to 6 inch, jabbing motions will
"belch" the snow from the chute.
PRODUCT SPECIFICATIONS
Rating:
120 V.A.C., 12amps, 60Hz
Clearing Width:
20"
Clearing Height:
8"
F–011013M
OPERATION
SNOW BANKS AND DRIFTS
In snow of greater depth than the unit, use
the "jabbing" technique described above.
Turn the discharge chute away from the
snow bank. More time will be required to re-
move snow of this type than level snow.
13