dirna Bergstrom Bycool COMPACT 3.0 Instructions De Montage page 21

Masquer les pouces Voir aussi pour Bycool COMPACT 3.0:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

COMPACT 3.0
Fasten supports tightening nuts until outside
15
EPDM joint (Point 3) of equipment is
compressed, between 3 and 6 mm.
Important: To avoid water from filtering inside
cabin, check EPDM joint tightening with
Compact base, as indicated on diagram. next
page.
Tighten (4) M8 nuts to Unit base and (4) to
16
support.
3-6mm.
Cabin roof
Fasten selflocked nut until
16
EPDM gasket is compressed
between 3 and 6 mm.
17
Tighten
the
channelling equipment fits together correctly.
Tighten the nut in point 11 until it comes up
18
against the top part of the interior air distribution
panel.
18
EPDM
Gasket
Cabin roof
Upholstey
EPDM gasket
A
(*) (approx. after tightening)
Hexagon
pieces
Unit base
Nut M6 (11)
Stud M6
1mm.
B
C
10 mm*
until
the
(D)
21
A
B
A
Air duct top side
Interior air distribution panel
EN
®
15
Check compression
thickness using a
tape measure in the
four corners.
C
16

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Bycool green line compact 3.0Bycool green sérieCompact 3.0

Table des Matières