LEGRAND Alpes Technologies ALPIMATIC/BX Guide D'installation page 41

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 1
Installation with two transformers:
 This installation requires:
Installation with two transformers and coupling system:
 This installation requires:
_____________________________________________________________________________________________________
CT 1
CT 2
o
1 CT on phase L1 of each transformer
1 general summation CT 5+5.../5 A
o
 The value of the primary to be programmed in the controller should be the
sum of the primaries of each transformer
o
1 CT on the main phase L1 of each transformer
o
1 CT on the group phase L1 for each transformer
1 general summation CT 5+5.../5 A for each transformer
o
 The value of the primary to be programmed in the controller should be the
value of the primary for the transformer to which it is connected
ALPTEC
40
EN

Hide quick links:

Publicité

Table des Matières
loading

Table des Matières