Télécharger Imprimer la page

Baxi UBHP 200 SC Manuel D'installation Et D'entretien page 14

Publicité

I materiali impiegati possono subire deformazioni a causa di oscillazioni di temperature; vi
raccomandiamo di conservarli in ambienti coperti ed a temperature miti ( 15÷20 °C).
ENG SOFT INSULATION:
TF = Plastic upper-cover
DS = Insukation disk 8soft polyurethan)
IS = Insulation jacket in two parts
CL = Zip fastener
RS = Plastic washer
Instructions for assembling:
1. The insulation jacket has to be leaned around the cylinder payng attention to coincide the
arranged holes with the connections.
2. Put the suitable plastic washer.
3. Close the zip fastenerleaning the 2 parts of the insulation jacket.
4. Put the insulation disk DS on the top.
5. Set up the plastic cover TF with care.
Please to remark:
The insulation jacket consist of materials wich are subjected at dilation or restriction owing to
swinging of temperatur – We recommand to keep yhen by temperatur of 15 – 20 °C.
I
ISOLAMENTO MORBIDO:
TF = Coperchio superiore
DS = Disco isolamento
IS = Isolamento diviso in 2 o più parti
CL = Cerniera lampo
RS = Rosette di finitura
Assemblaggio:
1.
Stendere le due parti dell'isolamento
"IS" in modo che i fori dell'isolamento "IS" e i
manicotti del boiler coincidano.
2.
Fissare l'isolamento "IS" con le rosette
"RS" adatte.
3.
Chiudere le due cerniere "CL" avendo
cura di facilitare la chiusura tenendo vicini i
due lembi dell'isolamento "IS" e spingendoli
verso il boiler.
4.
Inserire il disco isolamento "DS" in
modo da pareggiarlo con l'isolamento "IS".
5.
Mettere il coperchio "TF" avendo cura
di non rovinare l'isolamento "IS".
Attenzione:

Publicité

loading