Connector Pin Assignment - Buhler Smartline Notice De Montage

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 12
Smartline

4.4.3 Connector pin assignment

Connection regulated, heated line
Connection
Connection, self-regulating line
Connection
4.4.4 Flange socket installation (optional)
If you do not wish to connect the probe to a Bühler condition-
ing system, the following panel cut-outs are required for the
flange socket:
31
Ø 22
Fig. 1: Flange socket panel cut-out
10
Bühler Technologies GmbH
Pin
Assignment
1
L 230/115 V
2
N 230/115 V
3
free
4
free
5
Pt100
6
Pt100
7
PE
Pin
Assignment
1
free
2
free
3
N 230/115 V
4
L 230/115 V
5
free
6
free
7
PE
4.5 Installing the outlet filter
NOTICE
Outlet filter
The outlet filter is included and must be installed prior to ini-
tial start-up.
Operating without outlet filter prohibited!
Fig. 2: Outlet filter
Install the filter as described in chapter Replacing the outlet
filter.
5 Operation and Control
NOTICE
The device must not be operated beyond its specifications.
5.1 Operating the portable probe
NOTICE
Geometric arrangement during operation
Never operate the portable probe rolled up or stacked. The
outer sheath may otherwise be destroyed!
1.
Closely monitor the initial heat-up phase to detect any
faults early and take safeguards if necessary. Monitor fur-
ther operation of the portable probe.
2.
Be sure the medium at the entry or inlet point does not
exceed the max. temperature of the portable probe. The
probe may otherwise be damaged in these areas.
3.
Avoid extreme shock or movement whilst operating the
portable probe (shaking, vibration, etc.).
4.
A fitting may clog due to the medium solidifying and only
clear again after heating up for some time. Never attempt
to reduce the period with external heating (e.g. with a
torch, etc.). Doing so will damage the portable probe!
5.
If you notice damage or abnormal function of the port-
able probe during operation, switch off and disconnect
from the mains as quickly a possible.
6 Maintenance
Always observe the applicable safety- and operating regula-
tions when performing any type of maintenance. Please refer
to the original operator's manual on the included CD or online
at www.buehler-technologies.com for maintenance informa-
tion.
BX464002 ◦ 08/2020

Publicité

Table des Matières
loading

Table des Matières