A11
A12
A13
A14
A11:
Now position the coffer in the marked area at the door
sealing profile. Make sure that the shutter does not slip out
of the coffer notch. Check the coffer's height position. The
arm of the floor rail has to rest on the floor cover (also see
A13).
A12:
Carefully guide the top guiding rail past the door sealing
into the inside.
A13:
Finally, adjust the floor rail. The end cap should press itself
against the door sealing from the inside.
A14:
Screw the floor rail tight using the 2.9x16 countersunk
bold (A).
US/GB
9/17