EN
Commissioning
Putting the device into operation
Prerequisite
– The function tests were performed successfully.
– The device is installed correctly.
1
Remove the spray shield.
2
Clean the device.
3
Close the WC seat and WC lid.
36
4
Mount the design cover.
5
Remove the protective foil from the design
cover.
Result
ü The device is ready for operation and can be
handed over to the customer.
54043197390654347-1 © 11-2017
967.304.00.0 (02)