Package Contents; Installation - OHAUS Guardian 7000 Série Mode D'emploi

Masquer les pouces Voir aussi pour Guardian 7000 Série:
Table des Matières

Publicité

Guardian 7000 Series

1.3. Package Contents

Hotplate-Stirrer
Power Cord (pre-attached for 10x10-120V units)
Stir Bar (40 x 8 mm)
8" (20.3 cm) Stainless Steel RTD Temperature Probe
In-Use Cover

1.4. Installation

Upon receiving the Ohaus Hotplate-Stirrer check to ensure that no damage has occurred during shipment. It is
important that any damage that occurred in transport is detected at the time of unpacking. If you do find such
damage, the carrier must be notified immediately.
After unpacking, place the Hotplate-Stirrer on a level bench or table, away from explosive vapors. Ensure that the
surface on which the unit is placed will withstand typical heat produced by the unit and place the unit a minimum of
six (6) inches from vertical surfaces. Do not position the equipment such that it is difficult to disconnect the power
cord during use. Always place the unit on a sturdy work surface.
The Hotplate-Stirrer is supplied with a 3 conductor, grounded power cord that should be plugged into a matching
standard grounded outlet. If the cord supplied does not meet your needs, please use an approved power cord that
has ratings equal or exceeding those of the originally provided cord and that complies with the local/national
regulations of the country in which the equipment is to be used. Replacement of the plug must be made by a
qualified electrician.
EN-3

Publicité

Table des Matières

Dépannage

loading

Ce manuel est également adapté pour:

E-g71hsrdmE-g71hs07cE-g71hs10c

Table des Matières