Loewe Screen Lift Plus Instructions D'installation page 26

Table des Matières

Publicité

48
49
51
26
26
h2 + 1 cm
B2
50
52
B
Now lay the tubular section cover (B) flat and with the bulge facing
upwards on the floor. Measure the measured length h2 + 1 cm from
the end with the smaller cut-out (fig. 48) and mark it (fig. 49).
Place the tubular section cover in the sawing aid, fix it and saw it
with the hack saw at a right angle to the mark ( fig. 50). Deburr the
saw edge carefully with the file.
Measure the length h1 + 0.2 cm from the other end of the remaining
tubular section cover (fig. 48) and mark it. Place the tubular section
cover in the sawing aid, fix it and saw it with the hack saw at a right
angle to the mark. Deburr the saw edge carefully with the file.
Push the part B2 sawn first onto the top part of the tubular section
rod (fig. 51 and 52). Push the cover into the gap between the sleeve
of the ceiling bearing and the ceiling bearing.
h1 + 0,2 cm
B1

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

65486 série

Table des Matières