SCS Sentinel CTR51 Manuel D'installation Et D'utilisation page 75

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

> LEARNINg ThE TRAvEL oF ThE gATE - CTR50
Indicator
S4
lED Dl1
1 2 3 4 5 6 7 8 9 10
ON
OFF
8 9 10
11
12
13
14
15
16
17
18
19
Manually position the gate in its fully open
J2
position (Figure 1).
Use the manual unlocking system or a 24V
1
battery to put the motors in position.
NB: mandatory central and side stops
(non supplied)
press and release the button p2, the gate
will close in order to automatically learn
the limit of travel.
(Figure 2).
2
If the gate doesn't close completely, then
increase pV1.
Wait for the gate to be completely closed
and check that each motor stops at the
3
limit switches after 2 seconds of thrust.
(Figure 3)
en ::: 29
DL1
P1
P2
P3
RV1
20
21 22 23 24 25 26 27 28
J3
Keys P1, P2 and P3
potentiometer RV1
Butée latérale
obligatoire
Butée latérale
obligatoire
Butée latérale
obligatoire
during gate travel learning, all
safety devices are ignored.
Take all necessary
precautions and keep
everyone away from the
installation.
Butée latérale
FIguRE 1
Butée latérale
FIguRE 2
Butée latérale
FIguRE 3
EN
obligatoire
obligatoire
obligatoire

Hide quick links:

Publicité

Chapitres

Table des Matières
loading

Table des Matières