General Instructions
Installation:
1. Shut off water supply and drain
lines. Drill (2) two holes, approxi-
mately 1-3/8" [34 cm] diameter in wall
with 8" [20 cm] center to center.
8" [20 cm]
Note: The unit is also available with
6" [15 cm] center to center inlets.
2. After unpacking unit, remove
cartridge assembly from no.1.
(Loosen and remove no.3 at base of
no.4, slide no.4 off no.1.)
cartridge
4
5
assembly
3
3. Remove no.10 from no.1 and
attach to roughed-in piping (1/2" Iron
Pipe Size female inlets) using Teflon
Tape or pipe joint compound.
1/2"
NPT
supply
l i n e
4. Attach no.1 onto no.10 and supply
pipes; tighten with a wrench.
5. Replace no.5, then no.4 and make
sure no.4 is flush against wall.
6. Replace no.6, attach no.7, no.8 and
no.9.
6
1
10
13
7.Attach no.13 to outlet pipe using
Teflon Tape or pipe joint compound.
Make sure no.13 is flush against wall.
8. Turn on water and check for leaks.
1
10
10
1/2"
3/4" IPS
NPT
supply
supply
line to
l i n e
tub
4
wall
5
3
3/4" IPS
supply
line to
tub