General Instructions
Installation: B-0475
1. Shut off water supply and drain
lines.
2. Drill (2) two 9/32" diameter holes,
4-1/2" center to center in horizontal
sink support bar.
3. Place no.14 on top of no.2, mount
no.1 to horizontal support bar using
no.3 and no.15.
4. Apply tefl on tape or pipe joint
compound to threads of water supply
lines.
Support
Bar
10
1
2
3
5. Connect water supply lines and
check for leaks.
Note: If horizontal sink support bar
is not available, one of two wall sup-
ports must be installed:
15
14
Installation: B-0473
Wall Support
1. Determine actual measurements
(wall to front) and use measurements
below as a guide.
Note: No.19 can be shortened.
Basin Dim. 20" [50.8cm]
10
8"
[20.3cm]
B-0475
3 1/4"
17
[8.3cm]
Allow approx.
length of no.10
to extend in
front of basin
2. After trimming no.19 to desired
length (if necessary), mount no.21 on
wall with (3) three 7/16"[1cm] bolts.
3. Mount no.1 on no.16 with no.3.
4. Apply tefl on tape or pipe joint
compound to threads. Connect water
supply lines to (3) three 1/2" NPT
(National Pipe Thread). 2- inlets, 1-
outlet to no.1.
inlet
cold
Back View of no.2
4
4
wall to front
12"
[30.5cm]
2 inlets
1 outlet
20
19
20
21
inlet
hot
outlet
wall