Preparation & Installation - Zephyr Tornado II AK8200BS Guide D'utilisation, D'entretien Et D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

ZEPHYRONLINE.COM
Preparation & Installation
CAUTION
At least two installers are required due to the
weight and size of the hood.
1. Install blower into power pack:
AK8200BS - Blower is pre-installed
AK8300BSX - Refer to page 15 for instructions
NOTE: Remove blower mounting support screw
located on top of the motor housing before
installing the hood into cabinet.
2. Install 10" round adapter to the top of power
pack.
3. Install optional AK08xxAS Stainless Steel Liner.
Review manual included with liner for more
details.
4. If no liner is used, cut an opening in the bottom
of the cabinet by following the dimensions in
FIG. B.
5. Lift power pack into opening and secure to
bottom of cabinet using (4) M4 stainless steel
screws, (1) in each corner; see FIG. C.
NOTE: Wood blocking may need to be added
to cabinet base if additional support is
needed.
6. Install ductwork and seal with duct tape.
7. Install electrical.
8. Remove all packaging materials before using power pack. Switch power on and check for leaks
around duct tape.
9. Install baffle filters.
Tornado II & Tornado III Use, Care, and Installation Guide
Installation Instructions
AK8200BS
26-
1/16"
cabinet bottom cut-out size
minimum
minimum
3/4" wood base
3/4" wood base
metal or other non
combustible material
AK8300BSX
34-
"
-
11/16
FIG. B
Ductwork
Elec.
Front View
Front View
(4) M4 ss wood screws
(1) in each corner
FIG. C
13

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Tornado iii ak8300bsx

Table des Matières