Hach CL17sc Manuel D'utilisation page 23

Masquer les pouces Voir aussi pour CL17sc:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 27
c. Set the shut-off valve to open to start sample flow to the Y-strainer.
d. Connect the analyzer cable to the controller, if the cable was disconnected.
e. Supply power to the controller, if power was removed.
f. Push menu, then select SENSOR SETUP > [select analyzer] > PRIME.
Figure 7 Remove the pump clamp
7.6 Prepare for shipping
Chemical exposure hazard. Obey laboratory safety procedures and wear all of the personal
protective equipment appropriate to the chemicals that are handled. Refer to the current safety data
sheets (MSDS/SDS) for safety protocols.
To prepare the analyzer for shipping, do the steps that follow.
Items to collect:
Beaker with deionized water (2x)
1. Remove the reagents from the reagent lines as follows:
a. Remove the indicator bottle and buffer bottle from the analyzer.
b. Put two beakers (or containers) that contain deionized water in the analyzer.
c. Put the indicator bottle tubing and the buffer bottle tubing in the beakers.
d. Push menu, then select SENSOR SETUP > [select analyzer] > PRIME.
The analyzer removes the reagents from the reagent lines.
2. Remove the deionized water from the reagent lines as follows:
a. Remove the indicator bottle tubing and the buffer bottle tubing from the beakers.
b. Remove the two beakers from the analyzer.
c. Push menu, then select SENSOR SETUP > [select analyzer] > PRIME.
The analyzer removes all of the liquid from the reagent lines.
3. Disconnect the analyzer cable from the controller.
4. Turn the shut-off valve to the closed position to stop sample flow to the Y-strainer.
5. Disconnect the sample inlet (black) tubing and drain (clear) tubing from the analyzer.
6. Remove the pump clamp. Refer to
C A U T I O N
Figure 7
on page 23.
Original packaging
English 23

Publicité

Table des Matières
loading

Table des Matières