(For Trained Specialist Staff Only) - boso medilife PC3 Mode D'emploi

Masquer les pouces Voir aussi pour medilife PC3:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Calibration checks - Testing instructions
78

(for trained specialist staff only)

instrument (i.e. tweezers). The two
DE
connectors can be found on the
upper and lower side of the unit on
each side of the cuff. After removal
of the cuff, the air hoses become
GB
visible.
c) To perform leak testing of the pres-
sure circuit, T-connectors must be
FR
used to connect the rolled-up cuff
and a pump bulb to the pressure cir-
cuit.
IT
ES
Testing
1. Connect lower hose of the unit with
a pressure unit, i.e. pump ball.
2. Open battery compartment for
more than 5 seconds. Hold 'START'
button pressed down and insert
batteries.
3. Release 'START' button.
4. The unit is now ready for testing.
The displays of SYS and DIA now
show the actual pressure.

Publicité

Table des Matières
loading

Table des Matières