Installation Of Base Covers - Hoffmann Garant Tool24 PickOne Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

If the COM port (DB9 socket) on the master PC is oc­cupied, a RS232/USB
must be integrated.
6.3

Installation of base covers

The base covers are packaged on the pallet separately when the system is
delivered. They are only allowed to be attached once the system has been
erected and connected up in its final location.
Installation of the base covers
There are special mounting brackets on the covers to enable the fixation
of the covers to the adjustable feet.
There are recesses on the adjustable feet for mount­ing the covers.
PC ­ master device
RS232 to USB adapter
www.hoffmann­group.com
DE
EN
FR
IT
ES
103

Publicité

Table des Matières
loading

Table des Matières