Fortress Building Products Al13 HOME Instructions D'installation page 6

Rampe d'aluminium
Masquer les pouces Voir aussi pour Al13 HOME:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Fig. 1
1/2"
[12.5mm]
Step 3.
Mount Posts
1� Mark mounting hole locations and pre-drill a 3/8" [9�5mm]
hole�
2� Insert 3/8" x 3-1/2" [9�5mm x 89mm]Hex Head galvanized
bolts through 3/8" [9�5mm] galvanized washer and post
base plate�
• Post Base Plate holes MUST be positioned a minimum ½"
[12�5mm] from edge of deck board�
• Use only 3/8" [9�5mm] Hex Head Galvanized Bolts� Lag
Screws should NOT be used� Secure each post with four bolts�
Fig. 1
Step 4.
Check Mounted Posts
1� Shim post as needed to ensure post is level�
6
1/2"
[12.5mm]
Fig. 2
AL
HOME VERTICAL CABLE INSTALLATION
13

Publicité

Table des Matières
loading

Table des Matières