Registers And Frame Description; Configuration And Installation; Wiring Digital Input 2 Via The Terminal Block - ADEUNIS LoRaWAN Smart Building COMFORT Guide Utilisateur

Masquer les pouces Voir aussi pour LoRaWAN Smart Building COMFORT:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

LoRaWAN Smart Building COMFORT - Guide utilisateur / User guide version V2.1.1

3. REGISTERS AND FRAME DESCRIPTION

To know the content of the registers and of each frames (uplink and downlink) of the product, refers to the TECHNICAL REFERENCE MANUAL of
the COMFORT product, available on the Adeunis website:

4. CONFIGURATION AND INSTALLATION

FR
To configure the product, it is recommended to use the IoT Configurator (android and Windows application).
- Google Play :
https://play.google.com/store/apps/details?id=com.adeunis.IoTConfiguratorApp
- Windows 10:
https://www.adeunis.com/telechargements/
To configure the product using AT Command or install the product, please refers to the INSTALLATION GUIDE adeunis® available on the web-
site.
EN

5. WIRING DIGITAL INPUT 2 VIA THE TERMINAL BLOCK

https://www.adeunis.com/en/produit/comfort-temperature-humidity-2/
In order to be able to combine a dry contact sensor with the device and thus benefit from its Digital
Input 2, it is necessary to connect the sensor to the terminal block of the card.
Connection procedure for the wires:
1. Open the unit
2. Plug the two wires into each notch of the terminal block
3. Break the element of the casing so as to pass the wire onto the back of the casing
4. Configure the digital input 2 alarm
5. Close the unit
6. Restart the device with the button as for a first start
After this procedure the device will behave as during a first start
E.g.:
The LoRaWAN SmartBuilding COMFORT device can easily be combined with a cabled door contact via
the terminal block (Digital Input 2). Thus, positioned next to the door of a secure room under control,
the device will be able to send an alarm every time the door is opened/closed and thus enable the se-
curity manager or the building manager to verify compliance with the security requirements on the site.
Page
50
of 51

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Arf8275a

Table des Matières