S19-270C, S19-270E
Installation
NOTICE!
Avoid cleaners containing organic solvents, alcohols, and hydrocarbons.
Rinse with water after cleaning.
Supplies Required:
• Piping to ½" NPT water supply inlet on unit
• Sign-mounting hardware
The unit is pre-assembled for right-hand mounting. If left-hand mounting is desired, the unit must be disassembled and the
parts reassembled as shown.
Step 1: Attach eyewash
The top of the eyewash heads should be positioned a maximum of 45" from the floor.
1. Select the desired location for the eyewash on the sink deck and drill a ⁷⁄₈" diameter hole.
2. Secure the assembled unit to the deck with the nut and washer provided as shown on page 5.
Step 2: Connect water supply
1. Connect the water supply using flexible hose (supplied by installer) with ½" NPT threaded end.
2. Mount the safety sign to wall or pipe using sign-mounting hardware supplied by installer.
3. Open the water supply lines. Test for leaks and adequate water flow.
Left-Hand Mounting
S19-270C is shown; S19-270E is
reassembled in the same manner.
Position the
directional insert
as shown.
4
Position the bent pipe and
head assembly as shown.
Reseal the threaded
ends of the bent pipe as
10/30/2012
required.
Bradley • 215-1326 Rev. P; ECN 12-05-003C
Installation