Assembling The Side-Panel; Finishing; Packaging Materials - Dovre 350CB Installation Et Mode D'emploi

Masquer les pouces Voir aussi pour 350CB:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3.2.5. Assembling the side-panel

You can reduce the distance to combustible materials from 80 cm to 40 cm if
you change the galss-panel to a iron plate.
3.3.

Finishing

When the stove is placed in the final position and hermetically connected to the
chimney, you can replace all of the loose parts.
Your stove is now ready for use.
Attention: never light a fire with the inner plates or refractory stones re-
moved.
3.4.

Packaging materials

Packaging materials should be disposed of in a responsible way and in accor-
dance with governmental regulations.
350CB - 360CB - 350CB/SC - 350CB/3 - 360CB/3
27
03.27898.100

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

350cb/sc360cb350cb/3360cb/3

Table des Matières