8
Taking out of operation
Fig. 8-3
Completing the combined filling and draining filling con-
nection
F
2.
1.
E
3.
4.
Fig. 8-4
Screwing the combined filling and draining filling connec-
tion into the filling and draining connection
6
Open the fill/drain cock on the KFE filling connection and drain
the water content of the storage tank.
Only with
solar system
1
Adjust the valve insert on the connection bracket so that the path
to the blind plug is blocked off
2
Place a suitable collecting tray and remove the blind plug from
the connection bracket
(Fig.
Fig. 8-5
Shut off the valve insert, remove the blind plug from the
connection bracket
Installer reference guide
50
(Fig.
8-6).
8-6).
3
Insert the combined filling and draining filling connection in
the connection bracket and secure with the holding clamp
(Fig.
8-6).
Fig. 8-6
Installing the combined filling and draining filling connec-
tion in the connection bracket
4
Open the fill/drain cock on the KFE filling connection.
5
Adjust the valve insert on the connection bracket so that the path
to the drain hose is open (see also
content of the storage tank.
8.1.2
Draining the heating circuit and hot water
circuit
1
Connect the drain hose to the KFE cock of the indoor unit.
2
Open the KFE cock on the indoor unit.
3
Drain the heating and hot water circuits.
4
Disconnect the heating flow and return and the cold water feed
and hot water discharge from the indoor unit.
5
Connect the discharge hose on the heating inflow and return
flow as well as the cold water inflow and hot water outflow so
that the hose opening is at ground level.
6
Allow the individual heat exchangers to run empty one after the
other according to the siphon lifting principle.
8.2
Final shutdown and disposal
For final decommissioning of the indoor unit
1
taken out of service (see
Chap.
2
disconnected from all electrical and water connections,
3
dismantled in accordance with the installation manual in reverse
order,
4
disposed of in a professional manner.
Recommendations for disposal
We designed the indoor unit in an environmentally friendly manner.
During the disposal process, the only waste created is that which
can be used for material or thermal recycling. The materials used
that are suitable for recycling can be sorted into individual types.
Thanks to the environmentally friendly design of the in-
door unit, we have established requirements to ensure environ-
mentally friendly disposal. Proper disposal in compliance with the
respective national regulations of the country of use is the respons-
ibility of the user/owner.
Heat pump (indoor unit) with integrated heat accumulator
Fig.
8-5) and drain the water
8.1),
Daikin Altherma ETS(X/H)(B)-D
008.1447299_00 – 06/2019 – EN