Installation; Supplies Required - Bradley S19-120FM Manuel D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation

Installation

Supplies Required:

• Pipe sealant
• Piping to 1" NPT water supply inlet
• Adequate supply pipe supports
• Minimum 4" (102 mm) drain to accommodate
30 gallons (115 liters) per minute discharge for
shower waste
• (2) Ceiling fasteners (holes in cover plate are
Ø 1/4")
• Sign-mounting hardware
Step 1: Install drench shower
1. Rough-in the necessary ceiling cutouts as shown.
2. Connect the drench shower piping as shown
on page 4.
• Apply pipe sealant to all male-threaded
pipe joints.
• The bottom edge of the showerhead should
be 7'-0" (2134 mm) from the floor.
3. Assemble the showerhead components (Item
6) as shown on page 4.
Step 2: Connect water supply
Do not rely on Bradley's Drench Shower to support
supply piping.
1. Connect water supply piping to 1" NPT inlet
on unit (piping supplied by installer). Provide
adequate supports (supplied by installer)
for supply pipe using pipe hangers or other
means.
2. Thread the showerhead assembly onto the
elbow (Item 3). The showerhead shell will be
held in place by the springs.
3. Mount the safety sign to the wall using sign-
mounting hardware supplied by installer.
Ceiling
Tile
Showerhead
Shell
Showerhead
Assembly
Bradley • 215-148FM Rev. N; ECN 12-05-016E
Spring
Bracket
Spring
Ring
Ø 5"
(127mm)
1-7/8"
(48mm)
11-1/8"
(283mm)
Specify ceiling
height
4-1/2" to 6"
(114mm to
Ø 5-7/8"
152mm)
(149mm)
9" (229mm)
8/9/2012
S19-120FM
2"
(51mm)
2"
(51mm)
Ø 5/16" (8mm)
(2) places
Ø 3-1/4"
(83mm)
4"
(102mm)
minimum
8-1/2"
(216mm)
minimum
False ceiling
maximum
thickness
2" (51mm)
3

Publicité

Table des Matières
loading

Table des Matières