Battery Installation & Usage - TXED BIKE E-FOLDING XV Mode D'emploi Et D'entretien

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Checklist before Riding
3.1.1 Please ensure tyres are fully inflated as indicated on the tyre wall, before riding.
Remember, performance of the bike is directly related to the weight of the rider and baggage/load, together
with the stored energy in the battery;
3.1.2 Charge overnight, prior to riding the next day;
3.1.3 Apply chain oil periodically and clean if dirty or gummed up,using a degreaser, then wipe clean oil
bicycle chain again.
4. Battery Installation & Usage.
The electric bikes have the battery positioned within the rear carrier (the battery pack is directly connected to
the controller box in the front.(fig 2)
The slider of battery is fixed on carrier by bottom screws (Fig 2.1).
Then the battery case is locked by the key (fig3 & 4) see the operation details below.
(Fig.2)
(Fig 2.1)
8/85

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

E-2000

Table des Matières