EN
4
4.1
Commissioning wizard
As soon as the power supply to the controller is switched on,
the commissioning wizard starts automatically. This guides the
installer through the commissioning process.
Follow the instructions on the display to make the following
settings:
•
Set language
•
Set time and date
•
Start bleed program
•
Enter setpoints
4.2
6
5
40 / 124 – K410061000000-00 / 03.2020 – © www.kemper-olpe.de
Operation
Commissioning wizard
Controller
4
3
2
1
2
7
6
Operating elements with function
No Designation
1
Display
2
"OK"-button
1
3
"Esc"-button
4
"Down"-button
5
"Up"-button
6
Indicator light
Standard view of display
3
1
Outlet target temperature
2
Inlet target temperature
3
Inlet measured temperature
4
4
Drinking water pump capacity
5
Outlet measured temperature
5
6
Pump performance
7
Process medium buffer temperature
Information
All data entered are saved automatically. The
commissioning process may take 30 to 60
minutes.
Function
Display
Enter
Back
(navigate down)
(navigate up)
Lit green: Cooling system switched
on