Télécharger Imprimer la page

SUHNER MACHINING GEM 6 Dossier Technique page 32

Masquer les pouces Voir aussi pour GEM 6:

Publicité

Push the metal object onto switchpoint II. The motor starts
up.
Rotational direction check: For right-hand threads, the
belt pulley needs to rotate clockwise. The rotation direc-
tion on the motor can be changed by switching between
two phases.
If the wrong rotation direction is used, the lead
spindle will be damaged.
Push the metal object onto switchpoint III.
The motor changes direction. Reactivation of switchpoint
II. Motor stops and "Reverse rapid stroke" is executed.
Both of these functions can only be released via the con-
troller after a lag time of at least 0.5 to 1 second.
32
All manuals and user guides at all-guides.com
Fit the cover with four bolts.
2.3.3 c
Loosen the four fastening screws of the motor with ap-
prox. 2 turns each.
Lower the motor via the setscrew.
Onnecting the Belt

Publicité

loading